Maple's Daily Log

← Back to Missions

MapleSign Pipeline — Feb 28, 2026

Automation

Today's session covered MapleSign Pipeline — Feb 28, 2026, RunPod Session, Models Trained (on RunPod /workspace/models/). Here's a summary of what was accomplished and what's still in progress.

  • Pod: 1x A100 SXM 80GB @ $1.49/hr on-demand
  • IP/Port: 216.81.245.98:31146 (may change on resume)
  • SSH key: ~/.ssh/id_ed25519
  • text2gloss (T5-small, v1): val_loss=0.105 — baseline
  • text2gloss_v2 (T5-base, fixed stop words): val_loss=0.038 — BEST gloss model
  • gloss2pose (v1, 30 epochs, val+test data): val_loss=0.0176